Residential construction

From the foundation to the final fitting — the materials a home needs at every stage, and how they work together.

  • Foundations and frame
  • Walls, roof and waterproofing
  • Plumbing and finishes

Overview

Materials for building a home

A typical home moves through foundations, the concrete frame, masonry walls, roofing and waterproofing, plumbing and electrical services, and finally floors, walls and fittings. Each stage relies on different materials — and getting the right grade and quantity at the right time keeps the site moving.

Tell us the stage you are at and the quantities in your estimate, and we will help you put together a complete material list.

Request a Quotation

Key parts and what they do

What is used — and how it works

The main materials and components in this application, and the job each one does.

  • Cement and aggregates

    Bind sand and stone into the concrete and mortar used for footings, columns, slabs and masonry.

  • Reinforcement steel

    Steel bars carry the tension inside concrete, so beams, slabs and columns can span and bear loads.

  • Bricks and blocks

    Build the walls between the concrete frame, laid in cement mortar with lintels over every opening.

  • Roofing and waterproofing

    Membranes and coatings keep rain out of the roof slab, terraces and wet areas.

  • Tiles and flooring

    Hard-wearing, easy-to-clean surfaces for living areas, kitchens and bathrooms.

  • Wall finishes

    Plaster, putty, primer and paint protect the walls and give them their final finish.

Step by step

How the work usually comes together

  1. Foundation and plinth

    Excavation, a lean concrete bed, footings with their steel, then plinth beams.

  2. Frame and slabs

    Columns, beams and slabs are cast around reinforcement steel, floor by floor.

  3. Walls and roof

    Masonry walls, plastering, the roof slab and its waterproofing.

  4. Services and finishes

    Plumbing and electrical lines, then flooring, wall finishes, doors and fittings.

See it in 3D

A building, layer by layer

Switch layers on and off to see the structure, walls, roof and plumbing separately.

Building the 3D scene…
All parts in this scene (13)
  1. Work starts by marking out the column grid and digging pits for the footings. A thin bed of lean concrete (PCC) gives a clean, level base. Mats of reinforcement bars are set on cover blocks so the concrete surrounds them completely, then each footing and its pedestal are cast. Plinth beams link the footings just below floor level, the plinth is filled and compacted, and a damp-proof course under the walls stops ground moisture rising.

    Typical, for illustrationTypical materials: cement, sand, coarse aggregate, TMT bars, binding wire, cover blocks, damp-proofing.

  2. Each column starts as a cage of vertical TMT bars held by ties (stirrups). Formwork is fixed around the cage, concrete is poured and compacted, and once it has gained strength the formwork is struck and the concrete is cured with water. Beams frame every floor and carry the slabs and walls to the columns. Bar sizes, spacing and the concrete grade come from the structural engineer’s drawings.

    Typical, for illustrationTypical materials: TMT reinforcement bars, binding wire, cement, aggregates, shuttering, curing compound.

  3. Slabs are cast on shuttering with a mesh of steel bars in both directions, together with the beams below them. The concrete is vibrated, levelled and kept wet while it cures. Its top later receives screed and flooring inside, or waterproofing on the roof.

    Typical, for illustrationTypical materials: cement, sand, aggregates, TMT bars, cover blocks.

  4. Walls are built course by course in clay bricks, fly-ash bricks or concrete / AAC blocks, bedded in cement mortar with staggered joints. A reinforced concrete lintel spans every door and window, a sill sheds rain away from each window, and a sunshade (chajja) above it keeps sun and rain off the glass. The ground floor here is left as fair-faced brick to show the bond; the upper floor is plastered and painted.

    Typical, for illustrationTypical materials: bricks or blocks, cement, sand, lintel concrete and steel.

    Browse bricks and blocks
  5. Water from the municipal main passes a stop cock and the water meter into an underground sump. A pump lifts it through a non-return valve up the rising main to the overhead tank. From the tank a down-take runs down the wall, with a gate valve at the top and a valved branch to the bathroom and the kitchen on each floor. Inside the rooms the lines are concealed in the walls.

    Typical, for illustrationTypical: CPVC or UPVC pipes and fittings, gate and ball valves, pipe clamps, solvent cement.

  6. The tank stands on a steel frame above the roof so water can leave its outlet freely. A float valve closes the inlet when the tank is full; an overflow, a drain valve, a vent and a tight lid keep it safe and clean. Beside it, a solar water heater warms water for the bathroom.

    Typical, for illustrationTypical: water storage tank, float valve, tank connectors, stand, solar water heater.

    Browse water storage tanks
  7. In the bathroom a pedestal basin with its tap, a concealed shower mixer with an overhead shower, a WC with a wall-mounted cistern and a water heater connect to the concealed hot and cold lines, and a floor trap at the lowest point takes the shower water away. In the kitchen the sink is set in a granite counter over the base cabinets, with its tap on the wall.

    Typical, for illustrationTypical: sanitaryware, taps and mixers, angle valves, floor traps, kitchen sink and waste coupling.

    Browse sanitaryware
  8. The WC’s soil pipe, the floor trap and basin waste upstairs and the kitchen waste downstairs all join a vertical stack outside the wall, held by clamps. The stack rises above the roof to a vent cowl, so water flows freely and trap seals are not sucked dry. At ground level a bend turns it towards the inspection chamber.

    Typical, for illustrationTypical: SWR pipes and fittings, pipe clamps, vent cowl.

  9. Inspection chambers are built wherever drain lines join or change direction, with a smooth channel at the bottom and a removable cover on top. From here the drain runs on to the sewer or the septic system.

  10. Tiles go down once the plumbing is tested and concealed. Floors are laid on a cement–sand bed or tile adhesive and grouted; wet areas get anti-skid tiles over a waterproofed, sloping base, and the bathroom walls are tiled to door height. The kitchen wall behind the counter has a tiled dado that wipes clean, and the entrance porch and steps are tiled to match.

    Typical, for illustrationTypical: vitrified and ceramic tiles, tile adhesive, grout, spacers.

  11. Walls are plastered with a cement–sand mix and cured. Inside, wall putty fills fine pores and is sanded smooth before primer and paint; outside, a weather-resistant exterior paint protects the plaster. Here the upper floor, the columns and the floor bands are painted, while the ground floor shows its brickwork.

    Typical, for illustrationTypical: cement, plaster sand, wall putty, primer, interior and exterior paint.

  12. The roof is laid to fall towards its rainwater outlets and covered with a waterproof coating or membrane. Where it meets the parapet the layer is turned up the wall over a rounded fillet, so the joint cannot leak. The parapet is capped with coping that sheds water, and a down-pipe takes the rain to the ground. A stair cabin gives access to the roof.

    Typical, for illustrationTypical: waterproof coatings or membranes, primer, sealants, rainwater pipes.

  13. Door and window frames are fixed into the openings, then fitted with shutters, glass, hinges, handles and locks; the ground-floor windows get safety grills. Last of all the porch, paving and garden are finished — and the lights come on.

    Typical, for illustrationTypical: door frames and shutters, window frames, hinges, handles, locks, grills.

Educational visualization only. Layouts, sizes and materials are simplified and are not an engineering drawing, installation guide or guarantee of compatibility. Consult a qualified engineer or plumber for your project.